Project and Risk Management
Project and Risk Management
Assignment Title – Construction Planning
NETWORK PROGRAMME FOR A BRIDGE PROJECT
A concrete bridge is to be constructed for a motorway project and the following activities, durations and sequences of work have been established.
An elevation and section of the proposed bridge is indicated in Fig 1.
Activity Duration
Site strip – complete bridge
Pier A
Excavate pier
Blinding to pier
Fix reinforcement & formwork to kicker
Concrete pier foundation
Reinforcement to abutment
Fix formwork
Concrete abutment
Strip Formwork
Deck slab (piers A to B)
Fix precast concrete beams
Fix formwork to deck
Fabricate and fix reinforcement
Concrete deck
Strip formwork to deck
Curing period prior to striking formwork 4 days
3 days
1 day
3 days **
1 day
4 days
5 days
1 day
2 days
**repeat activities on deck between piers B and C
1 day
5 days **
3 days
1 day
2 days
7 days
** repeat activities on deck between piers B and C
Resources to be allocated – Case 1
The following resources of temporary works and plant are to be allocated for the bridge construction.
One hydraulic excavator
One pier shutter
One set of formwork for the deck span between the piers.
An assessment is required of the minimum construction period for the bridge project based on the above resources.
Alternative considerations
Make suggestions for reducing the contract period by means of increasing resources for the project.
.
NOTE:- Produce a network diagram for the project utilising activity-on –arrow or precedence methods.
ORDER THIS ESSAY HERE NOW AND GET A DISCOUNT !!!
You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.
Latest completed orders:
# | topic title | discipline | academic level | pages | delivered |
---|---|---|---|---|---|
6
|
Writer's choice
|
Business
|
University
|
2
|
1 hour 32 min
|
7
|
Wise Approach to
|
Philosophy
|
College
|
2
|
2 hours 19 min
|
8
|
1980's and 1990
|
History
|
College
|
3
|
2 hours 20 min
|
9
|
pick the best topic
|
Finance
|
School
|
2
|
2 hours 27 min
|
10
|
finance for leisure
|
Finance
|
University
|
12
|
2 hours 36 min
|