Assignment Instructions
Week 4 Assignment
For your assignment complete the following using screenshots, images or diagram of sample products, processes, etc. to illustrate and descriptive texts to address the items below (you may also consult YouTube.com as a source). This is not a research paper; however provide your source(s):
1. Provide a model (not a research paper) of the project management process in application development.
2. Illustrate how they relate.
3. Explain the consequences of not addressing each phase.
Submission Instructions: Upon completion, submit your completed project in this area of the classroom for grading.
Title your Word doc this way:
ENTD411 B001 Win 12
Week 4 Assignment
Last Name, First Name
Assignment Instructions
Instructions:
* Make sure you go to this week's chapter lesson for more guidance.
For this assignment, you will create an object class then display its assigned values from the main method of the main class.
Save the code in jGRASP, then save it in c:myjava and run it.
/*******************
Name:
Date:
Notes:
*******************/
class Car
{
add content and comments
public static String accelerate()
{
return motion;
}
}
public class CarObject
{
public static void main(String[] args)
{
add content and comments
}
}
Make sure that you include all source codes and the compiled codes into W4_firstname_lastname.zip.
You must leave me a note in the Submitted Text area on how to compile and run your code.
Its an exam to do within a time frame about Introduction to C, very basic questions. Ill receive the document at 5:20 and have to submit the answers before 7:35 (thats UTC-4, I live in Montreal)
The questions will be in french but I can translate them before sending them it shouldn't take me more than 20 min
Its an exam to do within a time frame about Introduction to C, very basic questions. Ill receive the document at 5:20 and have to submit the answers before 7:35 (thats UTC-4, I live in Montreal)
The questions will be in french but I can translate them before sending them it shouldn't take me more than 20 min
finical analyze: only two to 3 pages
- Do jimmy king and brian rowe have a legal case against Lisa ballentien? why?
- how do you think the outcry from social media affected the potential for a franchise opportunity for the penguin ?
- if you were King and Rowe, what would you have done differently when establishing the restaurant? rebuilding the penguin brand?
- whose side are you on?
- As an entrepreneur, would you invest in a Penguin franchise?
1. On a clear day, a group of your friends in the Astronomy club gets together to plan out
the astronomical events theyre going to try observing that night. Well make the
following assumptions about the events.
- There are n events, which for simplicity well assume occur in sequence separated by
exactly one minute each. Thus event j occurs at minute j; if they dont observe this
event at exactly minute j, then they miss out on it.
- The sky is mapped according to a one-dimensional coordinate system (measured in
degrees from some central baseline); event j will be taking place at coordinate dj , for
some integer value dj. The telescope starts at coordinate 0 at minute 0.
- The last event, n, is much more important than the others; so it is required that they
observe event n.
The Astronomy club operates a large telescope that can be used for viewing these events.
Because it is such a complex instrument, it can only move at a rate of one
You are to build a windows forms application project. This project deals with keeping track of the different budgets a company allocates to each department. As well as keeping track of all the expenses make of a given budget.
You are going to build 3 classes.
1. Base class Budget
2. Child class HomeBudget
3. Child class BusinessBudget
4. in Form1 you would need a listview and a listbox. The listview is used to display all the budgets
5. the listbox is to display all the expenses of the selected budget from the listview
Building the project
1. Create the project. Set up the Form1_Design to have a Listview, a listbox
2. Define a class Budget. This class should have
a. Private fields: _balance (this is the amount of money available or left in the budget
to be spent)
 
I want to model the shear wave velocity of a soil using matlab. The outcomes from the programming must result the variations of S-wave velocity versus depth. you can get some soil parameters from the internet to do the simulation. You must send me the reference in the word document ( where you will take your information from). The work must make sense in real engineering world. Conclusion and recommendation, and introduction must be provided. The out come from the work must be discussed properly. After doing the work, extract all results and place it in Ms word and send including the matlab coding. Please make sure to include table and figure in the work plus literature review relating to this topic ( using rayleigh waves to extract the shear wave velocity in the soil deposit) in the work. Include the references. I want to chat with the engineer that will be doing this work. I want to know as to whether he/she understands what I want to do here.
Base scenario:
Your company plans to purchase a new machine. Its purchase price is estimated at 500.000 . You plan to use the machine for 5 years. After that period you will be able to sell the used machine for 30.000 . During usage you have to bear costs for maintenance and repair that amount to 10.000 in the first year of usage and increase by 10.000 per year afterwards. Using that machine you could avoid purchasing components from external suppliers which currently cost 250.000 per year. You have calculated the NPV as shown in the following table.
Description of sub-tasks (weights might be different in actual THE!):
1. Calculation (40%)
You want to contrast NPV with another measure and decide to calculate the accounting rate of return for the investment. Make necessary assumptions to convert cash flow figures into cost and revenue figures and calculate the average accounting rate of return.
2. Interpretation/explanation (40%)
Is this an attractive inves
I want to model the shear wave velocity of a soil using matlab. The outcomes from the programming must result the variations of S-wave velocity versus depth. you can get some soil parameters from the internet to do the simulation. You must send me the reference in the word document ( where you will take your information from). The work must make sense in real engineering world. Conclusion and recommendation, and introduction must be provided. The out come from the work must be discussed properly. After doing the work, extract all results and place it in Ms word and send including the matlab coding. Please make sure to include table and figure in the work plus literature review relating to this topic ( using rayleigh waves to extract the shear wave velocity in the soil deposit) in the work. Include the references. I want to chat with the engineer that will be doing this work. I want to know as to whether he/she understands what I want to do here.