Enterprise Risk Management Emergency Management
I attached my final paper instructions. This is what you will be using I choose this facility and got it approved already.
Facility: Lincoln Tunnel
Top 1 disaster
1. Flooding
I will focus on flooding. The most recent flooding that happened in the Lincoln tunnel was caused by a water main rupture in a facility room.
A case study I found but you don’t have to use if you find something better is a study for Port of Miami Tunnel “Resiliency Through Flood Gates.” This study talks about building resilience to climatic risks and sea level predictions. It talks about how important flood gates are and the estimated amount of money you save by just having them if a flooding was to occur. The Lincoln tunnel has 44,600 pound flood gates as well, a water-tight barrier that seals the entire portal to the tunnels.
You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.
Latest completed orders:
# | topic title | discipline | academic level | pages | delivered |
---|---|---|---|---|---|
6
|
Writer's choice
|
Business
|
University
|
2
|
1 hour 32 min
|
7
|
Wise Approach to
|
Philosophy
|
College
|
2
|
2 hours 19 min
|
8
|
1980's and 1990
|
History
|
College
|
3
|
2 hours 20 min
|
9
|
pick the best topic
|
Finance
|
School
|
2
|
2 hours 27 min
|
10
|
finance for leisure
|
Finance
|
University
|
12
|
2 hours 36 min
|