Chemical Treatment
Unit III Project
Instructions
As a continuation of our course project due in Unit VIII (a proposal for an industrial and hazardous waste treatment facility), complete the next (fourth) section (chemical treatment) of your proposal by following the instructions carefully, and then submit your continued draft of your proposal into Blackboard for grading.
Instructions:
Closely read the Required Reading assignment from Bahadori (2014) and the Unit Lesson within the Study Guide.
Open your proposal draft from Unit II and make any improvements to your draft using your professors feedback from the Unit II project assignment.
Open the Unit III Study Guide, read the unit lesson, and then work with the embedded interactive model to decide what chemical treatment equipment to include in your treatment process design.
Continue from your Unit II Project and make your fourth level one heading titled Chemical Treatment. Describe the chemical treatment equipment that you engineered into your treatment process. Be sure and describe the relevance and anticipated reduction of related analytical concentrations within your industrial and hazardous waste treatment system as they correspond with each technology that you selected.
You are required to describe the equipment selection in at least 200 words (minimum).
You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.
Latest completed orders:
# | topic title | discipline | academic level | pages | delivered |
---|---|---|---|---|---|
6
|
Writer's choice
|
Business
|
University
|
2
|
1 hour 32 min
|
7
|
Wise Approach to
|
Philosophy
|
College
|
2
|
2 hours 19 min
|
8
|
1980's and 1990
|
History
|
College
|
3
|
2 hours 20 min
|
9
|
pick the best topic
|
Finance
|
School
|
2
|
2 hours 27 min
|
10
|
finance for leisure
|
Finance
|
University
|
12
|
2 hours 36 min
|