Week 5 Project

Fundamentals Of Project Management

Due February 17, 2020

Week 5 Project

Instructions

Resource and Time Budgets

You are going to be the project manager for the construction of a large warehouse for a major international company. Of course, there are many elements involved in constructing such a large facility, but this assignment will consider only one, the laying of the facilitys foundation (which is obviously preceded by site preparation and followed by the actual construction of the building).

In preparation for completing of this element of the projectlaying the facility foundationcomplete the following: 

  • Locate a source of data for the hourly wages that will need to be paid to those who will pour and finish the concrete foundation (the Bureau of Labor Statistics of the United States government is a good source for such information).  Be sure to document the source of your hourly wage data for such concrete workers. 
  • Locate a source of data for the cost of a cubic yard of reinforced concrete.  Be sure to document the source of your reinforced concrete cost data. 
  • Assuming that eight workers will be needed for the completion of the project, that they will work five days per week for 10 hours per day, and that it will take them three full weeks to complete the pouring of the foundation, what is your estimate (based on the hourly wage data that you located) of the labor expense of pouring the foundation? 
  • Assuming that the foundation will require 400 cubic yards of concrete, what is your estimate (based on the hourly wage data that you located) of the cost of the materials needed for pouring the foundation? 
  • How would Overhead charges (review the Budgeting chapter if you do not remember learning about this term) impact the two estimates that you have calculated? 
  • How would an increase in the cost of steel (one of the components of reinforced concrete) impact the budget that you had developed? 
  • If the construction site was impacted by a hurricane during the preparation of the foundation (meaning that work had to be temporarily stopped), how would the overall schedule of the construction project be impacted? 

Submission Details:

  • Provide your answers in a 3- to 4-page Microsoft Word document, using APA style. 
  • Support your responses with examples and research.
  • Name your document SU_MGT3035_W5_LastName_FirstInitial.doc.
  • Submit your document to the Submissions Area by the due date assigned.

 

 

You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.

 

Latest completed orders:

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min
[order_calculator]